Csi format interior glazing shop drawings
WebMaster Format 2016 EDITION GLAZING SECTION – 08 80 00 2.1.1 Acceptable manufacturer/supplier as specified in contract drawings and/or Interior Design drawing set and specifications or an Owner approved equal. Approved equals and/or substitutions will only be approved for Work if submitted and WebE. Glazing Deflection: Where interior glazing is installed adjacent to a walking surface, the differential deflection of two adjacent unsupported edges of glass shall not be greater …
Csi format interior glazing shop drawings
Did you know?
WebMay 10, 2016 · Glass in interior and exterior doors and sidelites. Glass within 36 inches (horizontal) of walking surfaces, with bottom edge less than 18 inches and top edge greater than 36 inches above walking surface, and glass area greater than 9 sf. Glass in guards and railings. These code provisions are minimum requirements. Web2. Field layout, shop drawings, record and as‐built drawings, testing services, quality control. 3. General liability, workman's compensation insurances. ... (New CSI format Div. 31 Earthwork, Div. 32 Exterior Improvements, Div. 33 Site ... Interior door caulking at door frames. v. Ceramic tile grout and mastic. vi. Sinks for basin undercoat.
WebSolar-Heat-Gain Coefficient (SHGC): Fixed glazing and framing whole assemblies shall have an SHGC of no greater than [0.40] as determined according to NFRC 200. Glazing Visible-Light Transmittance (VT) for exterior and interior panel assemblies is significantly affected by glazing color tint and insulation insert in panel assembly. Web08 1130 - Stainless Steel Doors and Frames. 08 1140 - Bronze Doors and Frames. 08 1160 - Accordion Fire Doors. 08 1170 - Window and Door Security Bars and Grilles. 08 …
WebAbout. Van Drafting is every glazing contractor's solution. As a one-stop shop for all glazing procurement, our online services include estimates, shop drawings and more. Our mission is to efficiently keep your job moving forward, providing attention to detail and promote your company's workmanship. WebShop Drawings: Include plans, elevations and details of product showing component dimensions; framing opening requirements, dimensions, tolerances, and attachment to structure ... Steel fire-rated glazed wall and/or window system, dual aluminum cover cap format. Face widths available: 2” ... Properties Interior Glazing.
WebARCAT Free Building Product CAD Drawings, BIM, Specs and more
WebA. Work Included: Provide specialty glazing and glazing accessories where ind icated on the drawings, as specified herein, and as n eeded for a complete and proper installation. B. Related Documents: General Conditions, Supplementary Conditions, and Sections in Division 01 of these specifications apply to the work of this section. how many days until september 19 2024WebThe shop drawings must indicate the codes that have been used in the preparation of the shop drawings. Shop drawings must include the following information: 1. The original date of issue; 2. The dates of all applicable revisions; 3. The project title; 4. Where applicable, the project address; 5. The project number; 6. how many days until september 17 2026WebCSI Master Format Divisions & Titles - cscheduling.b-cdn.net high tech auto care san jacinto caWebB. Submit shop drawings showing layout, profiles, and product components, including dimensions, anchorage, and accessories. C. Samples: 4 inch by 4 inch Samples of … high tech auto body wilmington deWeb• An expanded Layer Format that includes a two-character discipline designator and a second optional Minor Group. • An expanded Drawing View Layer List for users with a need to organize data by drawing type rather than by building system. • Expanded Layer Lists for Civil, Structural, Mechanical, Plumbing, and Telecommunications Disciplines. how many days until september 19 2025Web8. Details of moldings, removable stops, and glazing. 9. Details of conduit and preparations for power, signal, and control systems. D. Schedule: Provide a schedule of hollow-metal work prepared by or under the supervision of supplier, using same reference numbers for details and openings as those on Drawings. how many days until september 19thWebA shop drawing is the drawing set produced for the contractor, supplier, manufacturer, subcontractor and fabricator. The shop drawing shows more details than construction documents and different from the architect's drawings. Our draftsmen provide a full range for glazing shop drawing with high quality outputs, improvement in delivery time and ... how many days until sept 9